GME – LEADING THE WAY IN UNDERGROUND CONSTRUCTION SERVICES

Construction of an overrun tunnel, extension of the existing line with three underground stations.

The works include the construction of an 8.5m diameter and approximate 880m long and 100m below surface effluent tunnel.

Construction of a dual 3-lane tunnel for the Hong Kong-Zhuhai-Macao Bridge.

Contacts

Email:  info@gmehk.com

Phone:  (852) 3106 0333

Fax:  (852) 3105 1881